Released Payload Installation Requirements Documents

Installation Requirements Documents define the installation of Payload subassemblies which is performed by the STS during integration of the Cargo Element into the Orbiter. The requirements contained in these documents are provided and controlled by the payload Contractor.

PAYLOADS ARE BEING ADDED TO THIS PAGE ON A PERIODIC BASIS. PLEASE RETURN SOON

A to F
G to L
M to R
S to Z
PLEASE CLICK ON THE APPROPRIATE ALPHABETIC RANGE FOR THE ACRONYM OF THE ICD YOU WISH TO VIEW, OR USE THE SCROLL BARS TO MOVE THROUGH THE LIST OF DOCUMENTS

M to R
PDGF
TBD List
Power And Data Grapple Fixture Installation Requirements Document

 IRD-21338-PDGF

  Responsible Engineer:Charles Winter       Phone:281-226-8558
  


The Shuttle Payload Interface Control Document web site was produced by Boeing Space Exploration at Houston, TX. Please direct all questions about the content of this page to Carla Ewart at 281-226-5690.

This document was computer generated at 12-09-2008 10:17:38 by Boeing ICDMASTER software version 8.1.